Raw mill & waste gas treatment at kiln inlet
Proportioned raw material will be fed onto the air swept drying mill with size of Φ3.8×8.6m. In the process of rotating, raw meal will be raised by material raising device in the raw mill and sufficiently contact with hot gas from high-temperature fan at kiln inlet. By this means, raw meal will be dried. Dry raw meal is ground in the mill. Then the raw meal will fed onto high efficiency separator. Fine powder will be fed onto the raw meal-homogenizing silo via electric flap valve and air slide while coarse powder returned to the mill via electric flap valve and air slide. Hot gas from preheater goes through humidification tower and high-temperature fan and then divides into two parts, one part goes directly to electric dust collector, and the other part goes to raw mill head, and then 1/8 of this part goes to mill end. Waste gas out of mill firstly goes through high efficiency separator and raw mill fan (with inlet regulation valve), and joins the waste gas to the electric dust collector. After that, the waste gas will be purified by the electric dust collector and drained to the air.
The quality requirements of raw material
Name of raw material |
Chemical component(%) | |||||
SiO2 | Fe2O3 | CaO | MgO | Al2O3 | R2O | |
Limestone |
--- | <0.05 | >55 | <3 | --- | --- |
Whit mud |
60~70 | <1 | - | <1 | 13~25 | <2.5 |
Ceramic stone |
78~82 | <0.5 | - | <1 | <1 | <3.0 |
Silica sand |
>97 | <1.0 | - | <1 | <1 | - |
Main equipment photos
Maching capacity
After-sales service
Implementing the concept of pre-sale, in-sale and after-sale service:
1 Pre sale service:
Introducing products and related processes to users,Production Line Scheme and Technical Advantage,Providing pre-project technical advisory services,Customized Production Line Technical Solution for Customers.
2 Sale service:Manufacture excellent products for users,Provide customers with confidence in product quality.
Test:Strengthening Process Inspection and Intermediate Control,Strict Inspection System,Guarantee product quality,Providing quality products.
Train:Arrange experienced engineering technicians for training and guidance
install:Delegate engineers and technicians with experience in installation and commissioning to the site for installation and commissioning guidance,After customer acceptance is satisfactory,Qualified user opinion reports must be obtained.
3 After-sale service:
Regular guidance to users for product maintenance and maintenance,Free guidance for user installation,commissioning and product maintenance.Upon receipt of user failure handling requirements,Give maintenance advice within 24 hours.
Customer satisfaction is our constant pursuit, Always put the interests of customers first.
Certificate