Send Message
JIANGSU PENGFEI GROUP CO.,LTD 86-513 jspflq@126.com
Clinker Grinding Per Day 1200t OPC Cement Production Line

Clinker Grinding Per Day 1200t OPC Cement Production Line

  • High Light

    1200t Cement Production Line

    ,

    Clinker Grinding Cement Production Line

    ,

    OPC Rotary Kiln Cement Plant

  • Raw Material
    Limestone,clay,iron Ore Etc
  • Capacity
    1000tpd
  • Automatic Level
    Completely Automatically
  • Voltage
    380V,10kV,6.6kV,11kV
  • Weight
    As Per Process
  • Workign Days
    330 Days
  • Working Hours
    24 Hours
  • Color
    As Per Your Requirements
  • Warranty Period
    One Year
  • Place of Origin
    Jiangsu
  • Brand Name
    Pengfei
  • Certification
    CE,ISO
  • Model Number
    1000tpd
  • Minimum Order Quantity
    1 set
  • Price
    USD8000000-USD16000000
  • Packaging Details
    All the packing is suitable for the ocean transporting and inland transporting,1.The kiln shell is transported in 6 sections. 2.The supports is packed on the cushion.3. the small parts is packed in wooden box and iron frame.4.there will be shipping mark on
  • Delivery Time
    360 days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    1 SET PER 360 DAYS

Clinker Grinding Per Day 1200t OPC Cement Production Line

                                                WELCOME TO JIANGSU PENGFEI GROUP CO.,LTD

 

Clinker Grinding Per Day 1200t OPC Cement Production Line

 

Raw mill & waste gas treatment at kiln inlet

Proportioned raw material will be fed onto the air swept drying mill with size of Φ3.8×8.6m. In the process of rotating, raw meal will be raised by material raising device in the raw mill and sufficiently contact with hot gas from high-temperature fan at kiln inlet. By this means, raw meal will be dried. Dry raw meal is ground in the mill. Then the raw meal will fed onto high efficiency separator. Fine powder will be fed onto the raw meal-homogenizing silo via electric flap valve and air slide while coarse powder returned to the mill via electric flap valve and air slide. Hot gas from preheater goes through humidification tower and high-temperature fan and then divides into two parts, one part goes directly to electric dust collector, and the other part goes to raw mill head, and then 1/8 of this part goes to mill end. Waste gas out of mill firstly goes through high efficiency separator and raw mill fan (with inlet regulation valve), and joins the waste gas to the electric dust collector. After that, the waste gas will be purified by the electric dust collector and drained to the air.

 

  The quality requirements of raw material 

Name of raw material

Chemical component(%)
SiO2 Fe2O3 CaO MgO Al2O3 R2O

Limestone

--- <0.05 >55 <3 --- ---

Whit mud

60~70 <1 - <1 13~25 <2.5

Ceramic stone

78~82 <0.5 - <1 <1 <3.0

Silica sand

>97 <1.0 - <1 <1 -

 

Main equipment photos

Clinker Grinding Per Day 1200t OPC Cement Production Line 0

 

Maching capacity

Clinker Grinding Per Day 1200t OPC Cement Production Line 1

 

After-sales service

Implementing the concept of pre-sale, in-sale and after-sale service:

1 Pre sale service:

Introducing products and related processes to users,Production Line Scheme and Technical Advantage,Providing pre-project technical advisory services,Customized Production Line Technical Solution for Customers.

2 Sale service:Manufacture excellent products for users,Provide customers with confidence in product quality.

Test:Strengthening Process Inspection and Intermediate Control,Strict Inspection System,Guarantee product quality,Providing quality products.

Train:Arrange experienced engineering technicians for training and guidance

install:Delegate engineers and technicians with experience in installation and commissioning to the site for installation and commissioning guidance,After customer acceptance is satisfactory,Qualified user opinion reports must be obtained.

3 After-sale service:

Regular guidance to users for product maintenance and maintenance,Free guidance for user installation,commissioning and product maintenance.Upon receipt of user failure handling requirements,Give maintenance advice within 24 hours.

Customer satisfaction is our constant pursuit, Always put the interests of customers first.

Certificate

Clinker Grinding Per Day 1200t OPC Cement Production Line 2

Clinker Grinding Per Day 1200t OPC Cement Production Line 3

Clinker Grinding Per Day 1200t OPC Cement Production Line 4