Send Message
JIANGSU PENGFEI GROUP CO.,LTD 86-513 jspflq@126.com
OPC 1200000TPY Cement Clinker Plant

OPC 1200000TPY Cement Clinker Plant

  • High Light

    1200000TPY Cement Clinker Plant

    ,

    OPC Cement Clinker Plant

    ,

    100mm Industrial Crusher Machine

  • Capacity
    120000tpy
  • Application
    For Mining
  • Crushed Material
    Gypsum,Chalk,Brick
  • Max Inlet Size
    100mm
  • Motor
    AC Motor
  • Warranty Period
    One Year
  • After Sales Service
    Yes
  • Color
    As Per Your Requirements
  • Place of Origin
    JIANGSU,CHINA
  • Brand Name
    Pengfei
  • Certification
    ISO,CE,SGS
  • Model Number
    OPC
  • Minimum Order Quantity
    1 set
  • Price
    USD60000-USD600000
  • Packaging Details
    All the packing is suitable for the ocean transporting and inland transporting,1.The kiln shell is transported in 6 sections. 2.The supports is packed on the cushion.3. the small parts is packed in wooden box and iron frame.4.there will be shipping mark on
  • Delivery Time
    180 days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    1 SET PER 180days

OPC 1200000TPY Cement Clinker Plant

OPC 1200000TPY Cement plant

 

 Introduction of our company

Jiangsu Pengfei Group Co., Ltd. is a large leading enterprise in building material industry. Our company is a manufacturing and exporting base of cement machinery and equipment. Our company mainly produces comprehensive sets of rotary kilns, ball mills and cement machinery for new type dry process cement plant with capacities of 10,000tpd, 8,000tpd, 5,000tpd, 4,000tpd, 3,000tpd and 2,500tpd, as well as machinery for mining, metallurgy, chemical, electric power and environment protection industries.Our company pursues high quality and enterprise reputation. We cooperate with various academies from all over the country, and constantly explore and develop new techniques and products. 12 of our products have passed the evaluation of Ministry & Provincial certifications. Furthermore, 6 of our products are awarded an honor of "National New Products" and 5 products have attained the Ministry & Provincial Good Quality Certification, as well as 22 patents, 4 high and new technical certifications. Our company has many kinds of large machining equipment with strong machining capacities of 150,000MT/y to satisfy the requirements of rotary kilns and ball mill below 6 meters. Our equipment includes 8-meter hobbing machines, 8-meter vertical lathes, 5-meter vertical lathes, 6.3m*20m face lathes and 6.5-meter annealing furnaces. After 40 years' development, our company has formed production service from design, manufacture, installation to debugging. We supply 4.3*64m rotary kilns and 3.8*13m ball mills for Pakistan Lucky Cement Factory, two comprehensive sets of cement production lines for Myanmar Dragon Cement Factory, 5*74m rotary kilns and 3.8m wind swept coal mills of four cement production lines for National Industry Cement Co., Ltd. and Guangdong Taini (Yingde) Cement Co., Ltd, two 4.2*13m ball mills for Inner Mongolia Baotou Steel & Iron Factory and 4.0*60m rotary kilns and 4.6*13m ball mills of 2,500tpd cement production line for Vietnam Caesar Cement Factory. Our products sell well not only all through our country, but also in Russia, Japan, Korea, Southeast Asia, South America and Middle Africa. Our board chairman and general manager, Mr. Jia'an Wang, warmly welcomes all overseas experts, colleagues and friends to visit our company, and cooperate with us.

 


OPC 1200000TPY Cement Clinker Plant 0

PRODUCT DESCRIPTION

Physical analysis of Raw material:

  Clinker Gypsum Mixed material
Water content(%) 0 3.0 4.0
Inlet grain size 95%≤25 mm ≤200mm ≤200 mm
Production loss(%) 1.5 1.5 1.5

 

Product type:

Cement type Clinker(%) Gypsum (%) Mixed material(%) Total(%)
OPC Cement 95.00 5.00 -- 100.00
PPC Cement 85.00 5.00 10 100.00

 

Description of the 300tpd clinker grinding station

l Raw material storage yard and conveying

The clinker,gypsum, mixed material are transported to the storage place for storage, there set one 40×102m rectangle storage area which store the clinker, gypsum and mixed material distributed as per the storage capacity.the mixed material and gypsum of inlet size ≤200mm is transported to the special discharge pit by the dozer and conveyed by belt conveyor to cement dosing silo after being crushed to ≤25mm by the jaw crusher

l Cement proportioning silo and conveying

There set three Φ6.5×18m cement dosing silo (steel bin) to store the clinker, gypsum, mixed material. such three material are transported to the cement mill system after being weighed by speed adjusted belt weigher under the silo

l Cement grinding and conveying(closed circuit ball mill system)

The three material after being mixed shall be transported to ball mill for grinding, the mill adopt closed circuit, the cement from the mill shall be transported to the N1000 O-Sepa separator, the coarse powder from the separator shall be transported to the mill inlet through air chute, the finished product from the separator is transported to the Φ10×24m cement silo by bucket elevator. The mill outlet strength the ventilation to control the air flow inside the mill to reduce the over-grinding, the finess which collected by the bag filter is directly transported to the cement silo, the dust content of the waste gas after being purified is ≤50mg and directly emitted to the atmosphere. The average system capacity is 24~26t/h.

l Cement storage and conveying

Cement silo temporally consider one Φ10×24m storage silo,the total storage capacity is 3500t,storage period is 3 days.the quantity of cement silo can be adjusted as per the actual condition.the cement in the cement silo can be directly transported to the cement packing system.

l Cement packing and truck loading

Adopt one 8-spout rotary packer for cement packing; packing capacity is 100t/h;packed cement can be directly sent to bagged cement truck by two-unit automatic bagged cement loaders

l Air compressor station

The whole plant set one air compressor station with 2 sets of air compressor with the gas displacement 19m3/min,the discharge pressure is 0.8Mpa.the air compressor station shall meet the requirements of gas-control valve,measuring meter and pulse type bag filter.

l Center laboratory room

There is one center laboratory room(two-floor laboratory room in the center control room) inside the plant for conventional chemical analysis and physical test to raw material,semi-finished products and finished products to ensure quality of products inside the production plant; thus, quality of cement can be scheduled,managed and supervised.The power source of production line is 10.5kV 50HZ and 440V 50HZ. Total loading capacity is 1698kW,among them 10.5kV 50HZ 1020kW, 440V 50HZ 678kW.

 

Our Services
Implementing the concept of pre-sale, in-sale and after-sale service:
1 Pre sale service:
Introducing products and related processes to users,Production Line Scheme and Technical Advantage,Providing pre-project technical advisory services,Customized Production Line Technical Solution for Customers.
2 Sale service:Manufacture excellent products for users,Provide customers with confidence in product quality.
Test:Strengthening Process Inspection and Intermediate Control,Strict Inspection System,Guarantee product quality,Providing quality products.
Train:Arrange experienced engineering technicians for training and guidance
install:Delegate engineers and technicians with experience in installation and commissioning to the site for installation and commissioning guidance,After customer acceptance is satisfactory,Qualified user opinion reports must be obtained.
3 After-sale service:
Regular guidance to users for product maintenance and maintenance,Free guidance for user installation,commissioning and product maintenance.Upon receipt of user failure handling requirements,Give maintenance advice within 24 hours..
Customer satisfaction is our constant pursuit,Always put the interests of customers first..