Send Message
JIANGSU PENGFEI GROUP CO.,LTD 86-513 jspflq@126.com
6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment

  • High Light

    Rotary Kiln Cement Plant Equipment

    ,

    Cement Production Equipment Rotary Kiln

    ,

    6000tpd Cement Production Equipment

  • Process
    Dry Process
  • After Sales Serive
    Yes
  • Automatic Level
    Completely Automatically
  • Voltage
    380V,10kV,6.6kV,11kV
  • Weight
    As Per Process
  • Workign Days
    330 Days
  • Working Hours
    24 Hours
  • Color
    As Per Your Requirements
  • Warranty Period
    One Year
  • Place of Origin
    Jiangsu
  • Brand Name
    Pengfei
  • Certification
    CE,ISO
  • Model Number
    1000tpd
  • Minimum Order Quantity
    1 set
  • Price
    USD8000000-USD16000000
  • Packaging Details
    All the packing is suitable for the ocean transporting and inland transporting,1.The kiln shell is transported in 6 sections. 2.The supports is packed on the cushion.3. the small parts is packed in wooden box and iron frame.4.there will be shipping mark on
  • Delivery Time
    360 days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    1 SET PER 360 DAYS

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment

6000tpd Cement Production Equipment rotary Kiln Cement Plant Equipment

 

  Our company pursues high quality and enterprise reputation. We cooperate with various academies from all over the country, and constantly explore and develop new techniques and products. 12 of our products have passed the evaluation of Ministry & Provincial certifications. Furthermore, 6 of our products are an honor of "National New Products" and 5 products have attained the Ministry & Provincial Good Quality Certification, as well as 22 patents, 4 high and new technical certification s. Our company has many kinds of large machining equipment with strong machining capacities of 150,000MT/y to satisfy the requirements of rotary kilns and ball mill below 6 meters. Our equipment includes 8-meter hobbing machines, 8-meter vertical lathes, 5 -meter vertical lathes, 6.3m*20m face lathes and 6.5-meter annealing furnaces. After 40 years' development, our company has formed production service from design, manufacture, installation to debugging. We supply 4.3*64m rotary kilns and 3.8*13m ball mills for Pakistan Lucky Cement Factory, two comprehensive sets of cement production lines for Myanmar Dragon Cement Factory, 5*74m rotary kilns and 3.8m wind swept coal mills of four cement production lines for National Industry Cement Co., Ltd. and Guangdong Taini (Yingde) Cement Co., Ltd, two 4.2*13m ball mills for Inner Mongolia Baotou Steel & Iron Factory and 4.0*60m rotary kilns and 4.6*13m ball mills of 2,500tpd cement production line for Vietnam Caesar Cement Factory. 

 

1. Clay type raw material, Like loess, Clay. shale etc.

 

class n p MgO R2O SO3 Cl-
Class A 2.7~3.5 1.5~3.5 <3.0 <4.0 <2.0 <0.015
Class B 2.0~2.7 3.5~4.0 Not limited <3.0 <4.0 <2.0 <0.015

 

 

Maching capacity

 

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment 0

Process description

(1) Limestone crushing and transportation

After limestone is conveyed from mine to plant, if crusher is switched on, LS will be directly unloaded to receiving pit, and then by heavy duty apron feeder sent to single hammer crusher PCF1616 to be crushed, if crusher is switched off, LS will be unloaded to open-air stockpile, and then sent to receiving bin via loader for crushing.

The crushed limestone is sent to two limestone dosing silos (dia.Φ12m) by belt conveyer, elevator and tee valve.

(2) Auxiliary material crushing and conveying

When the exclusive receiving pit is free, clay is unloaded directly to the pit, and then sent to clay proportioning silo via apron feeder, tooth crusher, belt conveyer and elevator. When the receiving pit is full, clay will be firstly stacked at shed, and then conveyed by forklift to receiving pit when it is free, at last, it is conveyed to clay proportioning silo by apron feeder, crusher, belt conveyer and clay proportioning silo.

When the exclusive receiving pit is free, iron ore and sandstone is unloaded directly to the pit, and then sent to respective proportioning silo via raw crusher, elevator. When the receiving pit is full, they will be firstly stacked at shed, and then conveyed by forklift to receiving pit when it is free, at last, it is conveyed to respective proportioning silo by crusher and elevator.

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment 1

(3) Coal homogenization

Raw coal is unloaded directly to the pit after coming into plant, and then sent to raw coal preblending stockpile via apron feeder, belt conveyer, elevator and belt conveyer with discharging trolley, or firstly unloaded to open-air stockpile, and then conveyed by forklift to receiving pit subject to inform, at last, it is conveyed to raw coal preblending stockpile through apron feeder, belt conveyer, elevator and belt conveyer with discharging trolley. The blended raw coal is sent to raw coal bin through forklift and belt conveyer.

(4) Raw material proportioning silo and conveying

Raw material proportioning silo is composed of two concrete silos and three steel slab bins, and be measured by variable speed belt scale. Limestone silo consists of two Φ12m concrete silos, used for storage and proportioning. The proportioning bins is Φ6m,Φ6m and Φ6m respectively for clay, sandstone and iron ore.

(5) Raw mill & waste gas treatment at kiln inlet

Proportioned raw material will be fed onto the air swept drying mill with size of Φ3.8×8.6m. In the process of rotating, raw meal will be raised by material raising device in the raw mill and sufficiently contact with hot gas from high-temperature fan at kiln inlet. By this means, raw meal will be dried. Dry raw meal is ground in the mill. Then the raw meal will fed onto high efficiency separator. Fine powder will be fed onto the raw meal-homogenizing silo via electric flap valve and air slide while coarse powder returned to the mill via electric flap valve and air slide. Hot gas from preheater goes through humidification tower and high-temperature fan and then divides into two parts, one part goes directly to electric dust collector, and the other part goes to raw mill head, and then 1/8 of this part goes to mill end. Waste gas out of mill firstly goes through high efficiency separator and raw mill fan (with inlet regulation valve), and joins the waste gas to the electric dust collector. After that, the waste gas will be purified by the electric dust collector and drained to the air.

 

After-sales service

Implementing the concept of pre-sale, in-sale and after-sale service:

1 Pre sale service:

Introducing products and related processes to users,Production Line Scheme and Technical Advantage,Providing pre-project technical advisory services,Customized Production Line Technical Solution for Customers.

2 Sale service:Manufacture excellent products for users,Provide customers with confidence in product quality.

Test:Strengthening Process Inspection and Intermediate Control,Strict Inspection System,Guarantee product quality,Providing quality products.

Train:Arrange experienced engineering technicians for training and guidance

install:Delegate engineers and technicians with experience in installation and commissioning to the site for installation and commissioning guidance,After customer acceptance is satisfactory,Qualified user opinion reports must be obtained.

3 After-sale service:

Regular guidance to users for product maintenance and maintenance,Free guidance for user installation,commissioning and product maintenance.Upon receipt of user failure handling requirements,Give maintenance advice within 24 hours.

Customer satisfaction is our constant pursuit, Always put the interests of customers first.

Certificate

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment 2

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment 3

6000tpd Cement Production Equipment Rotary Kiln Cement Plant Equipment 4

The raw material requirements